Skip to main content

Solar power installed capacity

Verified

Before (baseline)

0.01GW

as of 2010-03-31

Now (latest)

97GW

as of 2025-03-31

Change

×9700

Over time

GW · source-verified data points only

Context & shortfalls

Baseline is 2010 — the year the Jawaharlal Nehru National Solar Mission (JNNSM) launched, when installed solar capacity was negligible (<10 MW). India's 100 GW solar target (originally 2022) was achieved by late 2024. The 2030 NDC target is 500 GW non-fossil fuel capacity. Utility-scale solar dominates new additions; distributed rooftop solar (~35 GW) and the PM Surya Ghar scheme form a growing segment. Land acquisition and grid integration remain challenges at scale.

Source

Ministry of New and Renewable Energy (MNRE) / PIB

https://pib.gov.in/PressReleasePage.aspx?PRID=2105824 ↗

Data as of 2025-03-31. Large national figures change frequently — verify at source before citing.