Solar power installed capacity
VerifiedBefore (baseline)
0.01GW
as of 2010-03-31
Now (latest)
97GW
as of 2025-03-31
Change
×9700
Over time
GW · source-verified data points only
Context & shortfalls
Baseline is 2010 — the year the Jawaharlal Nehru National Solar Mission (JNNSM) launched, when installed solar capacity was negligible (<10 MW). India's 100 GW solar target (originally 2022) was achieved by late 2024. The 2030 NDC target is 500 GW non-fossil fuel capacity. Utility-scale solar dominates new additions; distributed rooftop solar (~35 GW) and the PM Surya Ghar scheme form a growing segment. Land acquisition and grid integration remain challenges at scale.
Source
Ministry of New and Renewable Energy (MNRE) / PIB
https://pib.gov.in/PressReleasePage.aspx?PRID=2105824 ↗Data as of 2025-03-31. Large national figures change frequently — verify at source before citing.