Green hydrogen production capacity (announced / operational)
VerifiedBefore (baseline)
0MMT per annum target
as of 2023-01-04
Now (latest)
5MMT per annum target
as of 2030-01-01
Context & shortfalls
National Green Hydrogen Mission approved January 2023 — target: 5 MMTPA green hydrogen production capacity by 2030 with ₹19,744 crore outlay. India aims to become a global green hydrogen hub for export. As of 2024, production is in pilot/nascent stage (a few hundred MT); electrolyser manufacturing capacity is being set up. Green hydrogen requires renewable electricity + water electrolysis; cost parity with grey hydrogen requires electrolyser costs to fall ~60% from 2023 levels.
Source
Ministry of New and Renewable Energy — National Green Hydrogen Mission
https://mnre.gov.in/national-green-hydrogen-mission/ ↗Data as of 2030-01-01. Large national figures change frequently — verify at source before citing.